Monitor the environmental impact of powering your protected equipment. Understand the cost of powering your protected equipment. Gain a fact-based understanding of the energy usage of your protected equipment. Turn on/off, reboot or shut down select outlet groups to save dispatching technicians to remote locations (for UPSs with switched outlet groups). Turn off select outlet groups in a pre-determined sequence to shed less critical equipment and conserve runtime (UPSs with switched outlet groups). Preserves entire state of system and speeds time to recovery.Ĭonfigure select outlet groups to shut down and turn on in a pre-determined order (for UPSs with switched outlet groups). Supports Lotus Notes/Domino, MS-SQL Server, MS-IIS, MS-Exchange, and Siebel eBusiness Applications on Windows. Specify shutdown sequence ensuring sufficient time for each application to close safely. Prevents possible data corruption by performing graceful, unattended operating system shutdown in the event of an extended power outage.Ĭustomize a schedule for the shutdown and reboot of connected equipment and UPSs Note: This help sometimes uses PowerChute to represent PowerChute Business Edition, for example, PowerChute Server instead of PowerChute Business Edition Server.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
January 2023
Categories |